DE
IT
FR
ES
PT
CN
RU
 
Sitemap
 
Home
About Bystronic glass
Solution concepts
Products Architectural Glass
Loading
Storage systems
Cutting
Arrissing
Insulating glass manufacturing
Laminated glass manufacturing
first'lamiline
Control system
Loading
Washing / Drying
Clean room
Assembly
Heating zone
Off-loading / Autoclave
compact'lamiline
Window manufacturing
Handling equipment
Software
Services
Products Automotive Glass
Solar technology
Service / Support
PDF Catalogue
Mediadatabase
Living for the Future
News / Press Center
Career
Contact
 
Home >  Products Architectural Glass >  Laminated glass manufacturing >  first'lamiline >  Clean room

Clean room

The central element for trouble-free production

Clean room
The assembly room in the ground floor can be entered via a people
passage with two doors, one behind the other. A similar facility is
incorporated in order to bring in the PVB film coils without climate losses.
Due to steam-tight PUR panels, the requested clean-room and climatic
conditions are preserved. The perfectly coordinated air-conditioning
system regulates both temperature and relative humidity of the PVB film
coils. A redundant system is available for cold film coils.
Inquiry
 
Top of page
Print preview